We got some great feedback on the recent pictures we posted of the Oak Park project. I stopped out last week at the Hutchinson Residence where we are doing an entire home rehab. Our project manager Mark and site manager Santana has been doing a great job keeping this 8 week project on schedule. You can see from the photos below that in the first two weeks we did a successful deconstruction of the interior of the home and have begun framing out the new layout. The entire floor plan is being changed to open up this Chicago home, including relocation of the stairs which has been completed. Are you ready to have GreenWerks start your project? Give us a call today.

Framing, plumbing and electric are all working on site today!

The stairway was relocated and he built out the floor to cover up the area where the previous stair way existed.

Santana the GreenWerks site manager is reviewing the blueprints for this Chicago home remodeling project.
Keep Reading and Check out these Articles:
- Green Construction
- You Know Gas Prices Are High When Texans Start Driving Golf Carts
- Green Construction
- Garage Construction
- Client Testimonials


This is a great article. Thanks for sharing.
Are you using formaldehyde-free particle boards in the floor?